Estimated Total Capital Cost of the SPST, fully instrumented for two key programs:
| Phase A preliminary design study
(past expenditure, funded by SI) |
$ 49K |
| Phases B, C, & D construction, test and ship (OPP
Science Section expense) |
15,607K |
| Design, fabrication and installation of support tower (OPP
Research Support expense) |
1,434K |
| Cost of 200 m2 of equipped laboratory space at South Pole
(part of SPSM expenditures) |
1,940K |
| Ship 110 tons of material and equipment from Port Hueneme,
CA, to South Pole (OPP Research Support expense) |
951K |
| Support 6 workers at South Pole for 24 weeks during Phase E
reassembly (OPP Research Support expense) |
467K |
| Design and construct multichannel mm-wave CMB array receiver
(to be proposed later) |
1,947K |
| Construct submillimeter-wave bolometer array camera (to be
proposed later) |
6,381K |
|
Total Capital Cost (year 2000 dollars)
= $28,776K |
|