home

calculators

cheatsheets

contacts

datasheets

documents

drawings

inventory

links

maps

photos

procedures

tests

todo

weather

webcams












Description 1 Description 2 Description 3 Document
SMA Antenna Azimuth Gains Azimuth Gains.pdf
ESTOP ESTOP Threshold Adjustment.txt
patchPanelTestMenu.pdf
IRIG IRIG Threshold Adjustment.txt
Polarization Waveplate Swap Out Waveplate Swap Out.txt
Remote Stow Remote Stow.pdf
Remote Stow via tscb2.pdf
tscb2 Commands.txt
VESDA (Very Early Smoke Detection Apparatus) Cabin Smoke Detector Alarm Reset Procedure.html
Control Room Alarm Receiver Adjustment.htm
Computers kermit console.com use kermit console.com.txt
Rebooting Power PCs Rebooting PPCs.txt
To get rid of Firefox loading problem of a previous instance, delete the following two files: /home/.mozilla/firefox/.lock
/home/.mozilla/firefox/.parentlock
Documents/Procedures Correlator C2DC Replacement
cntrl_crate_power_mon
Correlator Board Config
Correlator Board Diag Status.txt
Correlator Board Replacement.pdf
corrSaver restart
Crate IRIG Adjustment
Crate Power Cycle
Crate Power Supply Replacement
Crate Replacement
Delay
Emergency Shutdown
Fixing a Stubborn correlator red box
MVME 2700/761 I/O Config
slowCrateReboot
Troubleshooting
Data Variable Viewing
Examples
Stderr Records Viewing (gstderr)
databaseValue.html
dBValue.txt
sampleRM.txt
shmValue.html
shmValue.txt
value.txt, antenna variables.txt
Engineering Summary Script 2006Dec07.csh
PACU and Correlator Room Startup and Shutdown Procedure  
Power PCs Rebooting PowerPCs
Priming Priming Notes.html
Priming Session Example.txt
Priming Summary.pdf
Receiver Tuning.pdf
Tips of tune6
tune6 Help File.txt
tune6 switches.txt
Tuning Algorithm.txt
Fusion Splicer Sumitomo Type 39 Fusion Splicer Quickstart Type39 Quickstart and Parameters.txt
GPS Spare GPS Receiver  TrueTime in colossus
IFLO 10 MHz Reference Selection 10MHz Switch.txt
C1DC Disable the C1DC ALC.txt
Cabin Spectrometer Cabin Spectrometer.txt
cspec session.txt
Ozone Monitor Procedure.htm
Calibrating the Continuum Detectors Calibrating Cont1Det1.txt
DDS Remapping the DDS.txt
eSMA/CSO/JCMT IFLO Control eSMA CSO/JCMT IFLO Control.txt
Fluke 189 Downloading Fluke 189 Memory Data to PC.htm
Holography Checkout Holography Checkout.txt
IF  IF Assembly Bulkhead Plates Mod.pdf
Optical Fibers CISCO Fiber Cleaning 1.pdf
CISCO Fiber Cleaning 2.pdf
CISCO Fiber Optic Cleaning and Inspection.pdf
CISCO Fiber Optic Cleaning with Compressed Air Issues.pdf
Instructions for terminating ST 5504034-1.pdf
OTDR.txt
Pre/Post-Move Checklist.htm
Pre/Post-Move Procedures.htm
Single-Mode Fiber Cleaning and Vault-to-Pad Measurement.pdf
Terminating an ST Connector.txt
Vector Voltmeter VVM_adcread.pdf
VVM-m5_logphase.pdf
YIG Automated Measurement of YIG Outputs.txt
YIG Power Script.csh
Changing the YIG Quad Threshold.txt
Keeping an Unused YIG Locked.txt
lockYIG.pdf
YIG Assembly Bulkhead Plates Mod.pdf
YIG Calibration.txt
Liquid Oxygen Filling the Helios Personal Oxygen System Helios Filling Guide.pdf
Maser Replacing the Maser's Backup Batteries Replacing the Maser's Backup Batteries.txt
Turn Off Dissociator and Pd Valve Maser Procedures.txt
Receiver LO Calibration, Receiver Tuning, and Cryostat Control LO Calibration, Receiver Tuning, and Cryostat Control.ps
Locking the Receiver Without Project LockTheReceiver.txt
Mixer Bias and Magnetic Field Tuning Mixer Bias and Magnetic Field Tuning of the SMA SIS Receiver.pdf
New Tune Command on hal New Tune Command on hal.html
Receiver Tuning Procedure Receiver Tuning.pdf
tune6 tune6 Help File.txt
Viewing Past IV Plots Viewing Past IV Plots.txt
PACU Checking the Compressor  Safety Switch Voltages Compressor Safety Switch Voltage Checks.txt
Reset Variable Frequency Drives (VFD) PACU Reset VFDs.txt
System Faults PACU System Faults.htm
Phase Monitor Power Up/Down Procedure PhaseMonEquip.txt
PowerPC PowerPC Commands PowerPC Commands
Safety Tire Chains Installing Snow Chains on SMA Jeeps.htm
Tire Chain Mounting Instructions.pdf
Summit Phone Summit Phone Instructions Summit Phone Instructions.htm
Timekeeping OMB-A122-Section 8m.pdf
SAO Staff Requirements.pdf
SAO Timekeeping Agreement.pdf
SD311-Section 2.pdf
VLBI Phased Array Processor and Analog Preprocessor Power Up/Down Procedures.txt